Last edited by Yozshushicage
Tuesday, August 4, 2020 | History

2 edition of Gas reactor international cooperative program interim report found in the catalog.

Gas reactor international cooperative program interim report

NUS Corporation

Gas reactor international cooperative program interim report

safety and licensing evaluation of German pebble bed reactor concepts

by NUS Corporation

  • 116 Want to read
  • 28 Currently reading

Published by Dept. of Energy, for sale by the National Technical Information Service in [Washington], Springfield, Va .
Written in English

    Subjects:
  • Pebble bed reactors,
  • Nuclear industry -- Licenses -- Germany (West)

  • Edition Notes

    Statementprepared by NUS Corporation, for General Electric, Advanced Reactor Systems Department ; prepared for U.S. Department of Energy
    SeriesCOO ; 4057-7
    ContributionsUnited States. Dept. of Energy, General Electric Company. Advanced Reactor Systems Dept
    The Physical Object
    Paginationca. 150 p. :
    Number of Pages150
    ID Numbers
    Open LibraryOL14877661M

    The Australia Government has released the ACCC’s first interim report into the supply of, and demand for, wholesale gas in Australia. The ACCC Gas Inquiry Interim Report focusses on likely supply and demand conditions for Estimates of gas supply have been compared to estimates of demand in the east coast gas market for , based on estimates of exports obtained from the. Interim Storage of Spent Fuel in Germany History, State and Prospects J. Palmes, C. Gastl Federal Office for Radiation Protection – Bundesamt für Strahlenschutz – International Conference on Management of Spent Fuel from Nuclear Power Reactors An Integrated Approach to the Back-End of the Fuel Cycle Vienna, June IAEA-CN

    Options for the interim storage of IEA-R1 research reactor spent fuels A.T. Silva a,*, M. Mattar Neto a, R.P. Mour~ao b, L.L. Silva b, C.C. Lopes b, M.C.C. Silva a a Instituto de Pesquisas Energe´ticas e Nucleares e IPEN/CNEN-SP, Centro de Engenharia Nuclear (CEN), Avenida Prof. Lineu Prestes, , Cidade Universita´ria, CEP S~ao Paulo, SP, Brazil. specifications, and safety analysis report to ensure common understanding of WCS’ application and clarity. (WCS) P.M. – P.M. - WCS’s progress, plans, and practices in responding to requests and observations in NRC’s J , letter. • Providing responses in standard format.

    Interim storage of spent nuclear fuel is ongoing in the United States. Approximat tons of spent fuel is in interim storage at operating nuclear power plants and several shut down and decommissioned power plants throughout the country.1 Utilities employ two interim storage methods for spent nuclear fuel: pools and dry casks.   The program received a total of $ million, 57% more than the next largest NE initiative, the Next Generation Nuclear Plant (NGNP). NGNP aimed to develop a high temperature gas reactor to generate both electricity and high temperature process heat for industrial applications, with construction of the first unit to begin in Cited by: 8.


Share this book
You might also like
Infant feeding, 1985

Infant feeding, 1985

Zinc adsorption by precipitated iron on lake bottoms

Zinc adsorption by precipitated iron on lake bottoms

Leisure forecasts 1994-1998.

Leisure forecasts 1994-1998.

Victorian Committee on Equal Opportunity in Schools

Victorian Committee on Equal Opportunity in Schools

Jane Austens literary manuscripts

Jane Austens literary manuscripts

Industrial espionage and mis-use of trade secrets.

Industrial espionage and mis-use of trade secrets.

Down the Road

Down the Road

Child Abuse

Child Abuse

Fireworks manual

Fireworks manual

Tunnel component of the tunnel and reservoir plan proposed by the metropolitan sanitary district of Greater Chicago

Tunnel component of the tunnel and reservoir plan proposed by the metropolitan sanitary district of Greater Chicago

A Muslim primer

A Muslim primer

Unbalanced influence

Unbalanced influence

Conquest of the land through 7,000 years

Conquest of the land through 7,000 years

Herbert Spencer.

Herbert Spencer.

Gas reactor international cooperative program interim report by NUS Corporation Download PDF EPUB FB2

Get this from a library. Gas reactor international cooperative program interim report: German pebble bed reactor design and technology review. [General Electric Company.

Advanced Reactor Systems Department.; United States. Department of Energy.]. Gas reactor international cooperative program interim report: German Pebble Bed Reactor design and technology review Technical Report This report describes and evaluates several gas-cooled reactor plant concepts under development within the Federal Republic of Germany (FRG).

Get this from a library. Gas reactor international cooperative program interim report: pebble bed reactor fuel cycle evaluation. [General Electric Company. Advanced Reactor Systems Department.; United States. Department of Energy.]. @article{osti_, title = {Comparative evaluation of pebble-bed and prismatic fueled high-temperature gas-cooled reactors}, author = {Kasten, P R and Bartine, D E}, abstractNote = {A comparative evaluation has been performed of the HTGR and the Federal Republic of Germany's Pebble Bed Reactor (PBR) for potential commercial applications in the US.

An Advanced Gas-cooled Reactor (AGR) is a type of nuclear reactor designed and operated in the United Kingdom. These are the second generation of British gas-cooled reactors, using graphite as the neutron moderator and carbon dioxide as coolant.

They have been the backbone of the UK's nuclear generation fleet since the s. The AGR was developed from the Magnox reactor, the UK's first. Advanced Gas Reactor Fuels Program Review Blaise Collin. Irradiations & Fuel Performance Modeling. JulyAGR-2 Safety Test PredictionsFile Size: 1MB.

Advanced Gas Reactor Fuels Program Review David Petti. Director, VHTR Technology Development Office. JulyOverview of the Advanced Gas File Size: 1MB. Back to E&E News index page.

NUCLEAR MIT report endorses centralized interim storage for spent reactor fuel. Peter Behr, E&E reporter. Climatewire: Friday, Septem Advanced Gas Reactor Fuel Development and Qualification Program Elements 4 Fission product transport & source term Fuel performance modeling Fuel irradiation.

Fuel fabrication. PIE and safety testing. Program participants: INL, ORNL, BWXT, GA. Founded. History. Full title International Cooperative Group on Environmentally Assisted Cracking of Water Reactor Materials (ICG-EAC). Aims. Coordinate international efforts on avoiding environmentally-assisted cracking (EAC) of structural materials in.

The Oil and Gas Commission (OGC) is responsible for regulating oil and gas activities in BC. With regards to Boreal Caribou and their habitat, the OGC should consider Government’s objectives for the management of oil and gas activities as per the Size: 71KB.

Internationalization of the Nuclear Fuel Cycle summarizes key issues and analyses of the topic, offers some criteria for evaluating options, and makes findings and recommendations to help the United States, the Russian Federation, and the international community reduce proliferation and other risks, as nuclear power is used more widely.

COthane, Methane from Waste CO. Final Technical Report- December Gas Reactor International Cooperative Program, HTR-Synfuel Application Assessment - September Recent Developments in Fluidized-Bed Methanation Research. Ninth Synthetic Pipeline Gas Symposium, October 31 – November 2, 07/11/ Four New Reports.

Advanced Gas Reactor TRISO Fuel Development and Qualification Program Overview Paul Demkowicz, Ph.D. Technical Lead, ART TRISO Fuel Post-Irradiation Examination.

DOE-NE Materials Crosscut Coordination Meeting. Septem Application Documents for ISP's WCS Consolidated Interim Storage Facility. The U.S. Nuclear Regulatory Commission (NRC) considers public involvement in, and information about, our activities to be a cornerstone of strong, fair regulation of the nuclear industry.

Pacific Gas and Electric Company (“PG&E”) hereby submits this report on Interruptible Load and Demand Response Programs for April.

This report is being served on the Energy Division Director and the service list for A Files include correspondence relating to Pohl's sabbatic leave, research including communications with international colleagues and correspondence with his graduate students; notes on energy which comprise reference files of clippings and handwritten notations; published reports on nuclear waste and waste sites, contaminated and non-contaminated sites, high-level nuclear waste disposal.

Six nuclear reactor technology concepts were identified in the DOE-initiated international Generation IV Technology Roadmap (DOE, ). Each of these six technologies, as well as several areas of crosscutting research, is now being pursued by a consortium of countries as part of the Generation IV International Forum (GIF), with varying levels of effort being expended by the various members of.

The high outlet temperatures and high thermal-energy conversion efficiency of modular high-temperature gas-cooled reactors (HTGRs) enable an efficient and cost-effective integration of the reactor system with non-electricity-generation applications, such as process heat and/or hydrogen production, for the many petrochemical and other industrial processes that require temperatures Cited by:   The main function of the Interim Storage for Spent Nuclear Fuel (ISSF) in Serpong site is to store-underwater the Spent Nuclear Fuel (SNF) arising from the operation of the GA Siwabessy Multipurpose Reactor (GAS-MPR).

Structure, system, and components (SSCs) of ISSF was built in and was designed by AEA Engineering, United Kingdom (UK - AEA). Pacific Gas and Electric Company (“PG&E”) hereby submits this report on Interruptible Load and Demand Response Programs for December This report is being sent to the Energy Division via [email protected] and served on the service list for AThe Fukushima Daiichi Nuclear Power Plant comprised six separate boiling water reactors originally designed by General Electric (GE) and maintained by the Tokyo Electric Power Company (TEPCO).

At the time of the Tōhoku earthquake on 11 MarchReactors 4, 5, and 6 were shut down in preparation for re-fueling. However, their spent fuel pools still required nates: 37°25′17″N °1′57″E / °N .Energy Oil and Gas Magazine.

During JuneAtlas Copco Rental revealed the method that we employed with our client, Mourik in the removal of catalyst material from the reactor of a large refinery in Antwerp, Belgium with a production capacity of aroundbarrels per day.